The Jemrok Civil team is currently undertaking the construction of an Intake Pump Line and Pump Station for the University of Tasmania; Institute for Marine and Antarctic Studies (IMAS) division at Taroona in Southern Tasmania.

Part of the project includes the design and construction of the underwater concrete support blocks which will secure the 3 x 355mm HDPE pipes, 450m long, to the floor of the Derwent River. It is estimated to be approximately 50 of these concrete blocks.

For further information on this project please watch the below video.